Cut ceiling opening & install collar, Attachment of quad ceiling inlet to ceiling – Hired-Hand Baffles, Vents, & Inlets: QUAD CEILING INLET User Manual

Page 2

Advertising
background image

HIRED-HAND, INC.

1733 County Road 68

Bremen, AL 35033

PHONE 256-287-1000

FAX 256-287-2000

Manual Part No. 4801-0175 Rev 9-00

Cut Ceiling Opening & Install Collar

Cut Ceiling Opening & Install Collar

Attachment Of Quad Ceiling Inlet To Ceiling

Attachment Of Quad Ceiling Inlet To Ceiling

1. Fit quad ceiling inlet

over opening in
ceiling.


2. Fasten quad ceiling

inlet to ceiling with
self-drilling screws
(not provided).
Insert screws through
outer flange of quad
ceiling inlet.


3. Fasten screws

securely.


4. Installation complete.

Quad Insulation Collar

0006-1151

Building Insulation

Building roof
truss cord

1. Frame opening

as shown for
installation of
ceiling inlet.


2. Install insulation

collar inside the
opening as shown.


3. Fasten insulation

collar to framing.

Quad Ceiling Inlet
attaches over
opening.

Interior Ceiling
Material

2 x 4" Lumber

framing between

trusses

Quad Insulation

Collar

OPENING

Advertising