Install in-line pump and assemble supply line – Hired-Hand Unitized Mega Cool: Square Bottom User Manual

Page 19

Advertising
background image

Part No. 4801-5396 Rev. 5-08

Unitized System - Square Reservoir

Page 19 of 63





























Install In-Line Pump and Assemble Supply
Line

1. Place the In-Line Pump on the platform as shown.

2. Connect the upper port of the strainer basket to the union. Hand

tighten ONLY.


3. Connect two 1-1/2" (3.81 cm) Male Adapter PVC Fittings to each side

of the In-Line filter.



























4. Cut two lengths 2 1/2" (10.16 cm) from 1-1/2" (3.8 cm) dia. PVC pipe.

Install one end of pipe to strainer basket union and the other end to the
1-1/2" (3.8 cm) coupling on the outlet-side of the filter.
IMPORTANT! : Install the filter with the arrow pointed in the
direction of the water flow (toward the In-Line Pump).


5. Connect the other 2-1/2"(10.16 cm) length piece of pipe to the inlet-

side of the filter and to the ball valve.

PVC Elbow 1 1/2"

(1021-0106)

2 1/2" pipe

Male Adapter

PVC Fittings

(1021-0109)

1 1/2 Union
(1021-0110)

4" pipe

PVC Elbow 1 1/2"

(1021-0106)

1 1/2" Ball

Valve

In-Line Filter
(1049-0100)

4" pipe

Pump

1 1/2" Ball

Valve

(1009-0101)

PVC Elbow 1 1/2”

(1021-0106)

PVC Elbow 1 1/2"
(1021-0106)

Strainer

(1062-5017)

In-Line Filter
(1049-0100)

Pump Union
(1021-6023)

11" pipe

52" pipe for a 4 ft System
64" pipe for a 5 ft System
76" pipe for a 6 ft System

6" pipe

Water Tank

(0406-8196)

PVC Reducer

1 1/4"x 1 1/2"

(1021-6016)

1 1/2" Ball Valve

(1009-0101)

Water Tank

Cover

(0406-8197)

Pump Support Bracket

(0404-8368)

1" Ball Valve

(1009-0103)

5" pipe

Advertising