Spotting event conflicts, Working in month view – Acer s60 User Manual

Page 64

Advertising
background image

3 W o r k i n g w i t h y o u r b a s i c a p p l i c a t i o n s
Using Date Book

52

Spotting event conflicts

With the ability to define specific start and end times for any event, it is possible to
schedule events that overlap (an event that starts before a previous event finishes).

An event conflict (time overlap) appears in the Week view as overlapping time bars
and in the Day view as overlapping brackets to the left of the conflicting times.

Working in Month view

The Month view screen shows which days have events scheduled. Dots and lines in the
Month view indicate events, repeating events, and untimed events.

To display the Month view:

Do one of the following:

• Tap the Month view icon .

• Press the Date Book application button

until the Month view appears.

You can control the dots and lines that appear in the Month view. See "Display
Options" on page 55 for more information.

Event conflict
in Day view

Event conflict
in Week view

Previous/next month

Dots on right side indicate events.

Crosses below date indicate untimed events.

Month view icon

Advertising
This manual is related to the following products:

s50