Main cover installation – Rhino Shelter HOUSE-12W X 20L X 8H User Manual

Page 7

Advertising
background image

Assembly Instructions House Style 12 x 20 x 8

Note: Snug the end panel by turning the turnbuckles or

repeating step 3 on a regular basis


V2.2

Do NOT Return Assembly To Dealer or Store. For All Assembly Questions or Shortages Please Call MDM Products Directly

Customer Service 800-447-7079 or 203-877-7070

7

MAIN COVER INSTALLATION

Step 1. To elongate the life of Main Cover, put a small
square of duct tape (field supplied) over each bolt head
on frame that comes in contact with cover. The tape
acts as a cushion to avoid rubbing damage to the cover
over years.


Unpack the Main Cover #MUC-5000 from the protective
plastic packaging. The line of grommets on the inside
(white) of the cover on the tie down Flap run parallel to
the sides of the frame assembly for positioning.


Once cover is oriented properly to the Frame Assembly,
pull Main Cover over frame assembly from the side,
being careful not to snag the cover on any member, bolt,
or other obstruction. Center the Main Cover over the
Frame Assembly with the Main Cover colored side
showing from the outside of the unit.

Step 2. Loosen the 4 remaining turnbuckles completely.
Place the turnbuckles into outer hole in the foot of each
end arch. Tie off the rope coming out of the Main Cover
rope slot on either side to the turnbuckles. After
securing one end of the rope in the Main Cover, pull the
excess slack out of the rope and cover to tighten. Hold
the end of the unsecured rope and apply pressure

Advertising
This manual is related to the following products: