Rhino Shelter BARN-12W X 28L X 12H User Manual

Assembly instructions

Advertising
background image

Assembly Instructions

Barn Style 12 x 28 x 12

V1.2

Do NOT Return Assembly To Dealer or Store. For All Assembly Questions or Shortages Please Call MDM Products Directly

Customer Service 800-447-7079 or 203-877-7070

1

ASSEMBLY INSTRUCTIONS

BARN STYLE 12Wx28Lx12H

Congratulations!

Congratulations on your purchase of a Barn Style
Portable Building by MDM Products LLC. With proper
installation, use, and maintenance, your new unit will
provide many years of good and suitable service. Your
new Rhino Shelter portable enclosure is a combination
of excellent engineering and well thought out design.
The unit is comprised of a rigid tubular frame, covered
with a long life polyethylene cover and double door ends.

The multiple part frame assembly is pre-drilled for easy
insertion of hardware to assemble. The tubing is made
from high-grade galvanized steel tubing, to resist
moisture and oxidation over the life of the shelter. The
covering membrane is made from ASTM-5 approved
polyethylene materials. The cover is also UV protected
for continual exposure to the sunlight.

It is suggested that you read the assembly instructions
completely before you begin. This will help attain the
best results for your installation.

SAFETY WARNING

The installation of this unit must conform to the

requirements of all authorities having jurisdiction in

your specific local area. In the absence of such

requirements, the installation must conform to the

provided assembly and installation instructions.

MDM Products LLC will not be responsible for failure

to comply with any requirements in a given local

area. Consequential damages or injuries caused by

improper installation, alteration, or improper use are

strictly that of the user. Unit MUST be cleared of All

Snow Accumulation immediately to avoid overload.

Unit is not to be used for occupancy for any length

of time. No running internal combustion engines,

open flames, or contact with heated surfaces are

allowed.

For installation assistance or Customer Service, please
call 800-447-7079 or 203-877-7070, 8AM-5PM EST.
Cartons should be inspected upon delivery from carrier,
and any evident damages should be noted on the bill of
lading before signing. If upon opening the cartons
hidden damage is noted, contact carrier or its agent
immediately. Claims for shipping damage MUST be
made with the shipping company. An inspection of the
goods will most likely be required. Do not discard
packing or any components before the freight company’s
inspection. All claims for freight damage must be made

with 15 days of receipt of the goods in accordance with
ICC regulations.

ASSEMBLY PROCEDURE

The proper sequence and steps to install this unit will
produce a proper and good installation. Failure to read
and follow these guidelines may result in an improper
installation and will void all warranty and protection the
owner is entitled to with the product. The steps to be
undertaken are:

1. Perform an inventory check before beginning to be

certain all components are available for installation.

2. Prepare location and place unit boxes near location

sight.

3. Assemble eight (8) arch assemblies of unit
4. Assemble first unit End Arch, first Interior Arch, and

Wind Braces with first Base Cross Rails and Side
Cross Rail sections.

5. Add additional Arch Assemblies with each section of

Base Rails, Side rails, and Top Ridge Rails.

6. Place frame into desired position and level frame

both end-to-end and side-to-side. Set Corners.
Measure frame feet across and square as needed.

7. Anchor frame assembly to ground with provided

Anchors, u-bolts and drive rod provided.

8. Install two (2) Doors on both ends of frame

assembly.

9. Install Main Cover over frame assembly.
10. Install Roll Up Door Kit to End Door.

TOOLS REQUIRED

The following hand tools are suggested for proper
installation of your new Rhino Shelter unit:

9/16” Open End Wrench

9/16” Socket or Box Wrench

Large Flat Tip Screwdriver

Maul or Sledgehammer

2-foot Level

10-Foot Step Ladder

INVENTORY CHECK

Start installation procedure by removing all components
from packaging and ensure all components are present

Item
No.

Qty

Description

1

16

Top Crest Support A

2

16

Top Crest Support B

3

8

Top Crest Tube

4

7

Swedged Cross Rail

5

42

Cross Rail

6

12

Foot Plate Tube

Advertising