Star Water Systems S1203 User Manual

Page 8

Advertising
background image

14

15

TOILET INSTALLATION

1. Pre-drill holes for closet screw sets at the points marked

earlier and install screws in holes.

Grinder/tank unit location

Closet

Screw Set

Locations

IL1751

Toilet

Location

4. Temporarily set the toilet in place to check that there

is no piping interference. Remove the toilet and set it

aside.

5. Using a 2 step PVC gluing system, connect the

discharge piping and grinder/tank unit discharge fitting.

CAUTION: When applying glue to discharge fitting,

ensure that none gets into the check valve assembly,

which is built into the cover of the grinder/tank unit. Pay

close attention to the proper alignment of the discharge

fitting previously marked in STEP 1.

6. Using a 2 step PVC gluing system, connect vent piping

as required for proper venting.

PIPING

3. For exposed installation, Install rubber coupling onto the

toilet discharge and grinder/tank unit hub and secure

with the worm clamps provided .

2. Place the toilet assembly over the closet screw sets.

Install the anchoring hardware and tighten in an

alternating pattern. Check for level and shim as required.

Be careful when tightening bolts or nuts against china to

avoid cracking the china.

IL1748

IL1749

2-Step

PVC

Gluing

System

Check

Valve

Assembly

Discharge

Fitting

Discharge

Pipe

IL1750

Vent

Pipe

Discharge

Pipe

IL1748

Closet Screw Sets

IL1753

Grinder/

tank unit

Inlet

Toilet Discharge

Rubber coupling

Clamps

4

5

6

1

2

3

Advertising
This manual is related to the following products: