Ft5000, Ac p – Triton FT5000 PC-BASED ATM Installation Manual User Manual

Page 40

Advertising
background image

40

Figure 3. Route cables through access

holes. Install snap bushing.

4. Install the supplied snap bushing

into the access hole that carries

the power and phone cords. See

Figure 3.

5. Plug the AC power plug into the

wall outlet.

2. Open the security vault door .

Ensure the power and Ethernet

cables are routed through the

cable clips located in the vault

cabinet (Figure 2).

3. Route the AC power cord and the

Ethernet (CAT-5) cable through

either of the cable access holes

(as applicable) in the security

cabinet, as shown in Figure 3.

Figure 2. Power and Ethernet cables

secured to cabinet.

FT5000

XP

- S

ITE

P

REPARATION AND

I

NSTALLATION

G

UIDE

C

ONNECTING

AC P

OWER AND

E

THERNET

C

ABLE

1. Unlock and open the control

panel sleeve door. Rotate the Rear

Service Display and Keyboard

Assembly out by pulling down

the locking pin. Verify that the

power switch located on the

power supply (Figure 1) is in the

OFF (0) position. Close the

control panel door.

Figure 1. Ensure power supply is in

the OFF (0) position.

* IMPORTANT *

AC power for the terminal should

come from a dedicated source with

an isolated ground.

6. Plug the Ethernet (CAT-5) cable

into the wall mounted jack.

Advertising