21

Checking Operation

Procedure

After you have completed configuration and installation of
your Triple Chassis:

1 Verify that the chassis is communicating properly

with the UPS by observing that the Status LED is
on.

2 Verify that an installed APC accessory is able to

identify the correct UPS model number and nomi-
nal output voltage.

If you have

problems with

your Triple

Chassis

“Troubleshooting: Table 4” on page 22 covers many of the
problems that might arise with the Triple Chassis. If you
encounter a problem with your chassis, refer to the table
first. There may be a simple solution you are overlooking.

Continued on next page