Checking operation, Procedure, If you have problems with your triple chassis – APC SMARTSLOT DP300E User Manual
Page 27: Procedure 21, If you have problems with your triple chassis 21
Advertising
21
Checking Operation
Procedure
After you have completed configuration and installation of
your Triple Chassis:
1 Verify that the chassis is communicating properly
with the UPS by observing that the Status LED is
on.
2 Verify that an installed APC accessory is able to
identify the correct UPS model number and nomi-
nal output voltage.
If you have
problems with
your Triple
Chassis
“Troubleshooting: Table 4” on page 22 covers many of the
problems that might arise with the Triple Chassis. If you
encounter a problem with your chassis, refer to the table
first. There may be a simple solution you are overlooking.
Continued on next page
Advertising