Document 51370    Revision A    ECN 00-190    06/16/2000

CAUTION

Install the agent release pull station in accordance with the supplied instructions, applicable NFPA standards, national and local Fire

and Electrical codes and the requirements of the Authority Having Jurisdiction (AHJ). Conduct regular testing of the devices using

appropriate NFPA standards. Fire•Lite is not responsible for devices that have not been properly installed, tested or maintained.

When used for CO

2

releasing applications, observe proper precautions as stated in NFPA 12. Do not enter the protected space unless

physical lockout and other safety procedures are fully completed. Do not use software disable functions in the panel as lockout.

Abort Plate Wiring (BG-12LRA only)

Connect the wiring from the agent release control panel's Abort Circuit to the wire leads D&E of the normally open abort switch.

Connect 24 VDC (+) to a form-c relay, this relay shall be called the Release Relay. Connect the relay's normally closed contact to the

System Normal LED wire lead A. Connect the relays normally open contact to the System Activated LED wire lead B. Connect the 24

VDC (-) to the LED assembly ground wire C.

BG1

2L

R

Awi

rin

g.c

dr

12345678901

12345678901

12345678901

12345678901

12345678901

12345678901

12345678901

Normally Open

Abort Switch

From agent release

control panel’s

manual release

circuit or previous

agent release

initiating device

To next agent

release initiating

device or ELR if last

device on circuit

Wiring Instructions
1)If semi-flush mounted to a single-gang box, proceed to

step #2. Mount the backbox and pull all necessary wiring

through it before wiring the agent release station.

2)Remove the correct amount of wire insulation. The agent

release pull station backplate is molded with a strip gauge

to measure the amount of insulation to be removed.

4)Connect the wiring from the agent release control panel's

Manual Release Circuit, or any previous agent release

initiating device to terminals 1 and 2 on the station's terminal

strip. Connect the next agent release initiating device or

End-of-Line Resistor (ELR) to terminals 1 and 2.

5)Maintain consistent polarity with all connections throughout

the manual release circuit.

WARNING! Do not loop wiring under any terminals. Break

wire run to maintain IDC supervision.

B

G

12L

R

A

ci

rc

ui

t.cd

r

*Mount End of line resistor on last unit.

BG1

2L

R

W

iri

ng2

.c

dr

Advertising
This manual is related to the following products: