Example 2: a double ring, Configure the master node (switch a) for domain 1, Domain 1 – Allied Telesis AlliedWare OS User Manual

Page 14: Domain 2

Advertising
background image

Page 14 | AlliedWare™ OS How To Note: EPSR

Example 2: A Double Ring

Example 2: A Double Ring

This example adds to the previous ring by making two domains, as shown in the following
diagram.

The master node for domain 1 is the same as in the previous example (except that the
domain has been renamed).

create vlan=vlan1000 vid=1000

add vlan=1000 port=1-2 frame=tagged

create vlan=vlan2 vid=2

add vlan=2 port=1-2 frame=tagged

delete vlan=1 port=1-2

create epsr=domain1 mode=master controlvlan=vlan1000 primaryport=1

add epsr=domain1 datavlan=vlan2

enable epsr=domain1

1. Configure the master node (switch A) for domain 1

Master

Node

(A)

Transit

Node

(D)

Transit

Node

(B)

epsr-example-double-ring

port 2:

secondary

Master

Node

(C)

port 1

Domain 1

control VLAN: 1000
data VLAN: 2

Domain 2

control VLAN: 40
data VLAN: 50

port 2

port 1

port 2

port 1:
primary

port 5:

secondary

port 4:
primary

port 4

port 5

port 4

port 5

Transit

Node

(E)

Advertising