KROHNE IFC 210 E-EEx EN User Manual

Page 71

Advertising
background image

Part C Special applications, functional checks, service, and order numbers Sect. 7.6

05/2002

IFC 210 E

71

7.6

Test of signal converter using GS 8 A simulator (option)

CAUTION!
The following applies to primary heads in hazardous areas:

Installation, electrical connection, commissioning and maintenance work may only
be carried out by persons who have been trained for work in hazardous areas and
are authorized to do so.


GS 8 A operating elements and accessories


a) Switch off power supply

before starting work !

A

mA meter, accuracy class 0.1,
R

i

< 500 Ohm, range 4-20 mA

b) Unscrew the 4 recessed head screws (S1)

on the front plate (see Sect. 8.1, Fig.).

c) Carefully pull off plug-in unit from subassembly

support.

d) The electrical connection is on the X1 and X2 connectors at

the rear hand side of the IFC 210 E signal converter as
shown in connection diagram with cable M.

Electronic frequency counter,
input resistance approx. 1 k Ohm,
range 0-1 kHz,
time basis min. 1 second,
see connection diagrams
in Sect. 2.5.

Electrical connection

D Switch,
Flow

direction


H Socket

for

H1

plug On cable M


H1 Plug of cable M

L

Power supply ON


M Cable

between

GS

8A

and

IFC 210 E

signal

converter


P

Potentiometer "zero point"


Y

Switch, Measuring ranges

Electrical connection

of mA meter and

electronic frequency

counter (see Sect. 2.5).

Power supply

connection

Advertising
This manual is related to the following products: