KROHNE CARGOMASTER User Manual

Page 17

Advertising
background image

CARGOMASTER®5

17 - Operators Manual

Screenshot 3 Naming the new condition

By pressing “OK” (or hit the Enter button) this condition is now created, and
set active. This will also show in the main views. First, the mode field should
now have a blinking orange background behind the text “Planning”. Next, the
name of the condition should appear to the right of this field. See below.

Screenshot 4 Verifying that the correct condition is active

With our new condition up running, we are ready for the group setup. Or, as
it’s called in CARGOMASTER® - “Prepare for loading”.

Prepare for loading

Define Group

In the port of Langesund we will be taking approximately 1.900 m³ of
Sulphuric Acid.

Press

F2

to bring up the “Prepare group for loading” dialogue:

Screenshot 5 Prepare for Loading – Group Setup

Advertising