KYORITSU 8031F User Manual

Page 2

Advertising
background image

(3) Make sure that all of the three lamps for phase check are on.

If so, there is no open phase. When any of the three lamps is
Not on there is open phase.

Open phase check

Open phase on terminal

Lamp "L1" is not on

where Red alligator clip
is connected.

Open phase check

Open phase on terminal

Lamp "L2" is not on

where Whight alligator clip
is connected.

Open phase check

Open phase on terminal

Lamp "L3" is not on

where Blue alligator clip
is connected.

*When the open phase check lamps are not on the rotating disc

does not turn.

(4) Check the rotating direction of the inside disc through the

phase sequence indication window.

*When the rotating disc turns counter-clockwise alternate the

connection of the two of the three alligator clips. Then, the
rotating disc will turn clockwise.

*When the rotating disc turns clockwise phase sequence is

L1,L2 and L3 in order of the power source terminals where the
Red, Whight and Blue alligator clips are connected.

Please Note : New European harmonized phase colours are

as follows.

Red = Brown

Protective Earth = Green yellow

Whight = Black

Neutral = Blue

Blue = Grey

92-1848

7/06

Printed in Japan

●Functional Design

Small, Lightweight and portable. Designed for maximum ease of
operation and ruggedness.

●Safety Design

No exposed metal parts. Safety features are incorporated
including the instant push button switch operation.

SPECIFICATIONS

Standard

: IEC 61010-1 CAT.600V Pollution degree 2

Voltage

: 110V to 600V

Frequency

: 50Hz / 60Hz

Withstand Voltage : 5,550V AC for one minute
Time Limit for Continuous Use : Within 5 minutes in case voltage

is above 500V.

Dimensions

: 106 (L) x 75 (W) x 40 (D) mm

Weight

: Approx. 350g

Fuse

: 0.5A / 600V (F)

Accessories

: Instruction Manual, Carrying Case

OPERATING INSTRUCTIONS

(1) Connect colour coded alligator clips or prods to the terminals

of a 3-phase power source where a rotating electrical machine
such as a motor will be connected or input to a building.

(2) Press the push switch button located on top of the unit.

Keep this button pressed during phase sequence or open
phase check. When the push switch button is released it
immediately goes off.

Advertising