American Water Heater 1010 319869-000 User Manual

Page 27

Advertising
background image

www.americanwaterheater.com 27

VENT PIPING TO BE
SLOPED (DOWN)
TOWARD HEATER
TO PREVENT WATER
FROM COLLECTING.

6 in. (15 cm)

MIN. LENGTH

ATTACH 45°

TERMINATION

ELBOW

RODENT

SCREEN

(INSTALL

INTO

ELBOW)

SEALANT

12 in.
(30 cm) min.

* WHERE SNOW COVER IS NORMAL DURING WINTER, ENSURE SUFFICIENT
VENT CLEARANCE TO PREVENT BLOCKAGE OR ICE BUILDUP.

SEALANT

GROUND

LEVEL*

FIGURE 25

INSTALLATION OF VENT SYSTEM, SIDEWALL

With the route of the venting system and selection of
materials completed, as discussed in the section of this
manual titled “Planning The Vent System”, the through the
wall vent terminal in place and the fi rst section of piping,
up to fi rst elbow, installed at the rubber coupling, it is time
to complete the installation of the venting system for the
sidewall installation.

FIGURE 26

VENT
PIPING TO
BE SLOPED
(DOWN)
TOWARD
HEATER TO
PREVENT
WATER FROM
COLLECTING.

VENT

RISER

ATTACH 45°

TERMINATION

ELBOW

RODENT
SCREEN
(INSTALL

INTO

ELBOW)

SEALANT

12 in.

(30 cm) min.

SEALANT

GROUND

LEVEL*

* WHERE SNOW COVER IS NORMAL DURING WINTER,
ENSURE SUFFICIENT VENT CLEARANCE TO PREVENT
BLOCKAGE OR ICE BUILDUP.

BRACKET

EQUIVALENT

VENT LENGTH

MEASURED

FROM THIS

POSITION

FIGURE 27

Before completing the installation of the venting system
be sure to read the sections of this manual discussing the
proper method of cutting and cementing PVC pipe and
fi ttings in the “Vent Pipe Preparation” section.

It is recommended that the completion of the venting
system start at the rubber coupling and run to the coupling
on the inside wall of the vent terminal (see Figure 23).

The vent system piping should be supported every
5 ft. (1.5m) of vertical run and every 3 ft. (91cm) of
horizontal run. All piping and fi ttings must be joined by
the proper procedures as described under: VENT PIPE
PREPARATION.

INSTALLATION OF VERTICAL VENT SYSTEM

A proper fl ashing or “BOOT” should be used to seal the
pipe where it exits the roof. The total vent system should
not exceed the equivalent feet of pipe as listed in Table
1.

Provide support for all pipe protruding through the roof. All
piping should be properly secured. The vent system piping
should be supported every 5 ft. (1.5m) of vertical run and
every 3 ft. (91cm) of horizontal run. All piping and fi ttings
must be joined by the proper procedures as described
under: VENT PIPE PREPARATION.

Advertising