STEP 1

STEP 1 -- Layout

Layout

A. Mark the centerline of each stile location from the back wall. The

centerline of the stile is ½" less than the overall dimension shown.

Measure out at each end of overall distance from first stall to
last line.

B. Mark the centerline of all 54” full height wall brackets.

C. From the sidewall measure along the centerline of the stiles to

locate the floor fasteners, to be located 1" in from each end of
each pilaster.

D. Mark all bracket holes to be drilled using brackets as templates.
E. Drill ¼" holes for wall brackets and floor fastenings.

F. Insert plastic anchors into holes ( See detail 4A).
G. Secure 54” wall brackets with #12 x 2½" screws.

STEP 2

STEP 2 –– Prepare Pilasters

Prepare Pilasters

A. If you have the “No Peek” design, then each pilaster is prepared

with a special rabbet on either side for the door strike or door
hinge. This rabbet will change for inswing or outswing. It is very

important to review your Metpar layout drawings to determine
which pilaster is used at each specific location by matching the

note illustrated next to each pilaster (ie; PYS4).

B. Locate the “1-ear”, “2-ear” or “U” brackets against the back of

each pilaster using the centerline dimensions. For FP500,
measure down 12 ½" from the top (see detail 2A). For FT700,
measure down ½” from top. For CH700 measure up ½” from
bottom. NOTE: CH700 pilasters use 70” pilaster brackets.
Fasten the bracket in place with #14 x ¾" sheet metal screws.

C. For FP500 stiles, extend the leveling bolt (jackstuds) so that it

measures 80½” from the top of stiles to the bottom of the
leveling bolt head.

D. Slide the stainless steel plinth onto the stile, but do not fasten.

Hold in place temporarily.

E. DO NOT install the pilasters in position until after step 3.

STEP 3

STEP 3 –– Position Panel

Position Panel

A. Set the panel onto some type of support (13 ½" high for FP500

and CH700, or 15" high for FT700) to maintain its elevation. See
detail 3A.

B. Orientate the panel so the metal heat sink is on the bottom. See

detail below.

C. Set the panel into the wall brackets BUT, DO NOT

DO NOT fasten the panel

to the wall brackets yet.




Metpar’s Polly

®

Installation Manual ~ February 2003

This could be a #144 2-ear, #145 1-ear,
or a #148 U bracket behind each stile.