CABLE REPLACEMENT KIT

Materials Furnished

Tools Needed

2 - (Two) Replacement Cables

2 - (Two) Power Drum Keys

Needle Nose Pliers

Hammer

1/4: Punch (Screwdriver will do)

Phillips Head No.3 Screwdriver

Box End or Hex Socket Wrenches

Tape Lockwasher

(Cable Clamp)

Flange

Weldment

Cable

Carrier

Weldment

Carrier

Pulley

Power

Drum

Screw “A”

Screw “B”

Shaft

Clamp

Limit

Cable

Carrier Pulley

Retainer

Power Shaft

Adjusting the Unit

A.

Turn unit upside down on a flat surface.

B.

With a socket or box end wrench, loosen the two hex head bolts

to relax the strap clamps holding the power shaft. The power shaft will turn about one

revolution when free of the clamps keep one hand on the power shaft while loosening the

clamps so it will not spin suddenly and cause the cable to "spill" off from the power drums.

C.

With the aid of another person, unwind the cables from the power drums by pulling the

cables up evenly (allowing the power shaft to turn) until the cables are completely off the

drums. Do not allow the cables to "spill" off the power drums, as this puts an undesirable

twist in the cables.

D.

Remove the eight screws from each power drum. If the load rate is to be increased, re-install

the screws into a smaller circle of holes. If the load is to be decreased, re-install the screws

into the larger circle of holes. Be certain that the same circle of holes is used on both of the

power drums. Be certain that the cable emerges between the same relative screw locations

on both power drums.

E.

Loosen the cable clamp hex nuts at the four corners under the flange.

F.

Hold the cables up to hold them taut. There will be two loops on each side-use your thumb

and index finger to support the loops on each side.

G.

Have another person wind up the torque tube in the direction of the arrow stamped on the

power shaft, until all of the cable is wound back into the power drums.

H.

Once the cable is wound tight, continue to turn the power shaft an additional 3/4 to one turn

(for head load required to support the weight of the mechanism), and tighten the clamp bolts

to prevent the tube from turning.

I.

Tighten-the cable clamp hex nuts at the four corners under the flange.

J.

Place the unit back in the counter and depress the platform fully several times to allow the

cables to attain their natural position on the power drums.

Advertising
This manual is related to the following products: