Connection – Timeguard SLFM360L User Manual

Page 6

Advertising
background image

5

6

Mark the position of the 75mm diameter locating hole centre
taking care to avoid ceiling joists and other obstructions within
the 75mm diameter. Drill a pilot hole to take the centre shaft of the
hole cutter. Use the hole cutter to cut the required hole.

Connection

THERE ARE 2 POSSIBLE CONNECTION SCENARIOS
1. Standard connection. See Diagram E.
The factory fitted ‘bridge’ wire must not be removed.
Connect the 3 or 4 core mains supply cable to the terminal block
on the unit as follows:-
NEUTRAL(Blue)

N

EARTH (Green/Yellow)

LIVE (Brown)

L

Connect the fourth core (lighting live) of the four core cable (if used)
to the L1 terminal block or the second 3 core cable (from the lighting)
to L1 (brown), n (blue) and E (green/yellow).
2. Switching DC loads or loads which use a different phase or voltage
supply from the AC mains. See Diagram F. Remove the factory fitted
bridge wire.
Connect the 3 core mains supply cable to the terminal
block on the unit as follows:-
NEUTRAL(Blue)

N

EARTH (Green/Yellow)

LIVE (Brown)

L

Connect the load in series with the load supply between L1 and L2
terminals.

Advertising