Installing communication wiring, Connect -48 vdc and frame grounds to tb1, Terminal block (tb1) – ADC HRM-238 L1 User Manual

Page 14: Nstalling, Ommunication, Iring

Advertising
background image

Installation

LTPH-UM-1237-04

6

July 21, 2004

HRM-238 List 1

1

Remove the fuse(s) in the equipment bay fuse panel for the circuit(s) where the HRM-238 shelf battery
wire(s) will terminate.

2

Connect one end of the frame ground wire to Terminal 4 (FGND) on TB1 of the HRM-238 shelf and attach
the other end of the frame ground wire to the CO ground wire termination point.

3

Connect the -48 Vdc CO battery to the HRM-238 shelf (

Figure 7

):

a

Connect a wire to the HRM-238 shelf TB1 Terminal 1 (-48V_A) for Primary CO battery.

b

Connect a wire to the HRM-238 shelf TB1 Terminal 2 (-48V_B) for Redundant CO battery.

c

Connect the battery common wire to HRM-238 shelf TB1 Terminal 3 (BATTERY RETURN) of the
HRM-238 shelf and attach the other end to CO battery ground source(s).

d

Connect the wire(s) from the HRM-238 TB1 Terminal 1 and Terminal 2 to the CO -48 Vdc power
termination point(s).

Figure 7.

Connect -48 Vdc and Frame Grounds to TB1

I

NSTALLING

C

OMMUNICATION

W

IRING

All wiring and connections for the HRM-238 shelf are on the back.

Figure 5 on page 4

shows the shelf backplane

and connectors. Connect the NMA wiring from the HRM-238 shelf to each HiGain or Megabit Modem line unit
that will be managed using the steps beginning on

page 7

. Then, use the other connectors in

“Connect to a LAN

or Interconnect Shelves” on page 9

and

“Connect to a Computer, Terminal, or Modem” on page 9

that are

appropriate for your application.

Table 2.

Terminal Block (TB1)

Terminal

Description

1

-48V_A

2

-48V_B

3

BATTERY RETURN

4

FGND

Terminal 1
to -48 Vdc

H0547-B

Terminal 4 to
frame ground (FGND)

Terminal 2
to -48 Vdc

Terminal 3 to battery
common (Battery Return)

Advertising