Water Inc EVERBREW1033518 User Manual

Page 4

Advertising
background image

Page 4

MOUNTING DIAGRAM
















Fig. 2

SET UP: (See Fig. 2)

TO INSTALL THE APPLIANCE PROPERLY, FOLLOW DIRECTIONS BELOW AND FIGURE 2 ABOVE.
NOTE: TO AVOID POSSIBLE DAMAGE TO THE CABINET, MAKE SURE TO USE THE MOUNTING PLATE AS A TEMPLATE TO DRILL THE TWO (2) 3/32”
DIA. PILOT HOLES.

a. Determine the desired location of the appliance.
b. Remove the brew cone from the appliance and remove the wing nut (See Fig. 2, Illust. #3) from the lower mounting screw and slide the mounting plate out from the rear

of the appliance.

c. Loosen, but do not remove, the nut holding the “L” bracket to the rear of the mounting plate. Holding the mounting plate in place flush along the bottom edge of the cabinet

facing (See Fig. 2 Illust. #1), drill two (2) 3/32” Dia. pilot holes on the cabinet using the 2 holes provided on the mounting plate flange to assure that the mounting
screws will go in easily and not damage the cabinet.

d. After drilling the two (2) pilot holes, hold the mounting plate in place (Fig. 2, Illust. #2), install two (2) screws through the holes provided at the front edge of the mounting

plate and tighten. This will mount the front of the mounting plate.

e. While holding the mounting plate level, hold mounting “L” bracket up against the bottom of the cabinet and mark the location of the rear mounting screw through the slot in

the “L” bracket. Drill a 3/32” pilot hole at the marking to assure that the mounting screw will go in easily and not damage the cabinet. Install the mounting screw through
“L” bracket, at the location marked.

f. Hold the mounting plate level, tighten the nut to hold the rear of the mounting plate in place.
g. Slide the appliance onto the mounting plate making sure the attachment screw on the rear of the appliance fits into the slot on the “L” bracket. Attach the wing nut to hold

the appliance in place. Level the appliance and tighten the wing nut.

Note: Make sure the appliance is level. If the appliance is not level, loosen the top mounting nut and level the appliance. Tighten nut.

PLUMBING CONNECTION: (See Fig. 3 below for a typical water line connection.)

Note: This coffee brewer is designed to operate with water pressure of 30 to 80 psi. If the water pressure exceeds 80 psi, it is recommended that a water pressure
regulator (not included) to be installed and reduce the water pressure to 50 psi.

2.

Depending on water conditions in your area, it is recommended that an in-line water filter or other water filtering system (not included) be installed to improve the quality
of the water. It is recommended that a shut off valve (not included) be installed on the incoming water line to allow the water supply to be turned off for cleaning and
servicing. The shut off valve should be installed to the machine before any water filtering system that may be installed.

3.

After installing the desired components onto the incoming water line, flush the water line to remove any impurities that may be present in the line, and to flush an inline

water filter, if installed. (If installed, read the in-line water filters manufacturers

recommendations for correct flushing procedures.)








Fig. 3.

Typical water line connection

Advertising