American Standard Green Tea T010.5XX User Manual

Installation instructions, Green tea, Pressure balancing bath and shower trim kit

Advertising
background image

Recommended Tools

Flat Blade Screwdriver

Adjustable Wrench

Channel Locks

Plumbers' Putty or Caulking

Phillips Screwdriver

Teflon Tape

FINISHED WALL

4"

TOP OF TUB RIM

BOTTOM OF TUB

74" FOR HEAD

CLEARANCE

3-1/8" REF.

1-5/8" TO 3"

18" OPTIONAL

4-5/8" REF.

5-7/8" REF.

1/2" NPT

1/2" NPT

7-1/2"

9-1/2" REF.

OPTIONAL TO FINISHED

FLOOR USUALLY

BETWEEN 65'' AND 78'

"SEE ILLUSTRATION "

Certified to comply with ANSI A112.18.1

ROUGHING-IN DIMENSIONS (For reference only)

To assure proper positioning in relation to wall, note roughing-in dimensions.

PRESSURE BALANCING BATH

AND SHOWER TRIM KIT

GREEN TEA

SERVICE

5

Remove HANDLE (1), CAP (2) and CARTRIDGE (4). Clean inlets

and MANIFOLD (5).
Reassemble CARTRIDGE (4), alternately tightening SCREWS (3).
Replace CAP (2) and HANDLE (1). Check flow.

If faucet drips, operate handle several times from "off"

to "on". Do not apply excessive force.
Clogged CARTRIDGE (4) inlets may cause reduced flow in "full

on" hot or cold. To clean inlets, first turn off water supply, then:

5

4

3

2

1

6

PRESSURE BALANCE

BATH/SHOWER TRIM KIT

MODEL NUMBER

M962627-YYY0A

SHOWER ARM

AND FLANGE

M950203-YYY0A

DIVERTER SPOUT (1/2" NPT)

M950204-YYY0A

SHOWER HEAD

Installation

Instructions

T010.5XX

GREEN TEA

T010.5XX

THREADED INLETS (STOPS)

INLETS

1/2" NPT

5-7/8"

INLETS 1/2" NPT

OUTLETS
1/2" NPT

OUTLETS
1/2" NPT

3-3/8"

3-3/8"

3-3/8"

THREADED INLETS

SHR. 1/2" NOM.

COPPER SWEAT

TUB 1/2" NOM.

COPPER SWEAT

4-1/16"

5-7/8"

INLETS

4-1/16"

4-1/16"

INLETS

1/2" NOM.

COPPER

SWEAT

SHR. 1/2" NOM.

COPPER SWEAT

TUB 1/2" NOM.

COPPER SWEAT

2"

SWEAT

INLETS

SWEAT

INLETS (STOPS)

INLETS

1/2" NOM.

COPPER

SWEAT

M968592 Rev.1.1

M968592 Rev.1.1

M968592 Rev.1.1

"B"

"B"

3

ADJUST HOT LIMIT STOP

By restricting handle rotation and limiting the amount

of hot water allowed to mix with the cold, the HOT LIMIT

SAFETY STOP reduces risk of accidental scalding. To set

the maximum hot water temperature of your faucets, all

you need to do is adjust the setting on the HOT LIMIT

SAFETY STOP.

Use a flat blade screwdriver or your fingers to pull

up and rotate red HOT LIMIT SAFETY STOP (1).

Follow Step "A" or "B" to adjust min./max. discharge

temperature. "0" being the hottest to "7" the coldest

temperature setting. Factory set at "0".

HOT LIMIT SAFETY STOP ADJUSTMENT

PRY RED RING

FORWARD AND ROTATE

COUNTER-CLOCKWISE

ONE CLICK

PRY RED RING

FORWARD AND

ROTATE CLOCKWISE

"A"

"A"

ADJUSTMENT WHEN

WATER IS TOO HOT

ADJUSTMENT WHEN

WATER IS TOO COLD

"RED RING"- HOT
LIMIT SAFETY STOP

TEMPERATURE

SETTING

NUMBERS

1

0 1 2 3 4

5

6

1

2.5MM HEX

WRENCH

4

HANDLE INSTALLATION

3

1

INSTALL VALVE TRIM

1

Figure 1.

Figure 2.

Figure 3.

3

5

6

4

2

1

Figure 1. Remove plaster guard from valve. Push CAP (1)

over VALVE CARTRIDGE (2) until seated against stop.

Figure 2. Push ESCUTCHEON HOLDER (3) onto CAP (1)

and attach with LONG SCREWS (4). Mount ESCUTCHEON

SUPPORT (5) to ESCUTCHEON HOLDER (3) with 4 SHORT

SCREWS (6).

Figure 3. Align PINS (7) on back side of ESCUTCHEON (8)

with the FOUR HOLES (9) in ESCUTCHEON SUPPORT (5)

and press ESCUTCHEON (8) flush against finished wall.

PLSTER

GUARD

9

5

PIPE

PLUG

PIPE

CAP

1

4

3

2

SHR.

ELBOW

1/2" NPT

TUB NIPPLE

4-1/8"

REF

.

Remove pipe cap and plug from shower and tub

rough piping. Apply Sealing tape to SHOWER ARM (3)

and tub filler pipe.

Install SPOUT ESCUTCHEON (5) onto SPOUT (1) and thread

SPOUT (1) onto tub nipple. Tighten SPOUT (1) and slide

ESCUTCHEON (5) flush agasinst finished wall.

CAUTION: Protect finish on TUB SPOUT (1) when installing.

Install SHOWER ESCUTCHEON (2) onto SHOWER

ARM (3). Thread SHOWER ARM (3) into shower elbow

and tighten. Slide ESCUTCHEON (2) flush agasinst

finished wall.

Thread SHOWER HEAD (4) onto SHOWER ARM (3).

5

2

INSTALL TUB SPOUT, SHOWER HEAD,

SHOWER ARM WITH FLANGE

CAUTION: Protect finish on SHOWER HEAD and

ARM when installing.

CAUTION: Protect finish on SHOWER
HEAD and TUB SPOUT when installing.

Install HANDLE (1) by pushing it onto CARTRIDGE STEM (2)

and tightening SET SCREW (3) from below with 2.5mm

Hex Wrench supplied.

2

M907050-YYY0A

CAP

M962625-YYY0A

ESCUTCHEON AND SEAL

M962626-YYY0A

HANDLE

M962427-0070A

ESCUTCHEON HOLDER

HOT LINE FOR HELP

For toll-free information and answers to your questions, call:

1 (800) 442-1902

Weekdays 8:00 a.m. to 6:00 p.m. EST

IN CANADA 1-800-387-0369 (TORONTO 1-905-306-1093)

Weekdays 8:00 a.m. to 7:00 p.m. EST

Product names listed herein are trademarks of American Standard Inc.

© AS America, Inc. 2007

IN MEXICO 01-800-839-12-00

CHROME

002

Replace the "YYY" with

appropriate finish code

Thank you for selecting American-Standard...the benchmark

of fine quality for over 100 years.
To ensure that your installation proceeds smoothly--please

read these instructions carefully before you begin.

DO: SIMPLY RINSE THE PRODUCT CLEAN WITH CLEAR WATER. DRY WITH A SOFT COTTON FLANNEL CLOTH.

DO NOT: DO NOT CLEAN THE PRODUCT WITH SOAPS, ACID, POLISH, ABRASIVES, HARSH CLEANERS, OR A

CLOTH WITH A COARSE SURFACE.

CARE INSTRUCTIONS:

7

8

4-3/16"

Advertising