HP XP P9000 Command View Advanced Edition Software User Manual

Page 178

Advertising
background image

NOTE:

If Replication Manager is not running when a task is scheduled to execute, the task will be executed
as follows:

For tasks

with an execution interval specified, the task is run at the next execution time after startup

occurs.

For tasks

without an execution interval, the task is run immediately after startup occurs.

For example, if you create copy groups A and B, which constitute a multi-target configuration, and
copy groups C and D, which constitute a cascade configuration, Replication Manager generates two
tasks, each on a copy group basis, for each workflow.

TIP:

For situations such as when storage system resources and host applications are managed by different
administrators, the work status at any point during copy pair creation by a wizard can be saved as
a workflow and passed from one administrator to the next. In this case, a new task is generated when
the wizard finishes and the saved workflow is overwritten.

Because associated tasks have an execution order, a task that must be executed prior to another task
is known as a prerequisite task. If an execution problem occurs, error messages are displayed indicating
when a prerequisite task has failed and the steps necessary to correct the problem.

Managing pair life cycle

178

Advertising
This manual is related to the following products: