Scheduled archiving – HP Storage Mirroring V5.1 Software User Manual

Page 106

Advertising
background image

15 - 7

Scheduled archiving

Archiving can be scheduled to occur automatically at periodic intervals.

1.

Right-click the connection on the right pane of the Management Console and select Connection

Manager.

2.

Select the Archive Schedule tab.

3.

To enable scheduled archiving, enable Automatically run archiving tasks on a schedule.

4.

Specify the criteria that you want to apply to your replication set data. All Archiving Criteria

must be met at the time the scheduled archive is initiated for a file to be archived.

Archive files when disk usage meets or exceeds—This option is a first level filter. If disk

usage exceeds the specified percentage, Storage Mirroring will check the remaining criteria to

determine if any files should be archived. If disk usage is not above the specified percentage,

no archiving will occur.

Archive files inactive for—This option is a second level filter. It specifies the age, in days,

of the files that you want archived. If disk usage has been exceeded, any file older than the

age specified will be archived.

Archive files when size meets or exceeds—This option is also a second level filter. It

specifies the size, in KB, of the files that you want archived. Any file equal to or larger than

the specified size will be archived.

5.

Specify the archiving schedule that you want to use. Specify the Start time and the days of the

week to run the archiving process.

6.

Click OK to save the settings.

When the archive process is initiated by the schedule, the Mirror Status column will change to

Archiving.

NOTE:

If you disable the scheduled archive after it has already archived files, the archived files

will remain as link files on the source until they are recalled. No additional files will be

archived unless you enable the schedule again or manually initiate an archive.

Advertising
This manual is related to the following products: