HP 3PAR Operating System Software User Manual

Page 447

Advertising
background image

Tasks & Schedules Manager

Common Actions panel – Contains options for creating schedules for the following: create
a virtual copy, create a consistency group virtual copy, compact a common provisioning
group, or adaptive optimization.

The Toolbar – Contains options to create schedules, and to edit, suspend, resume, and
remove a schedule. At least one row in the table displayed in the Management Window
must be selected to enable the Edit, Suspend, Resume, and Remove scheduling actions.
These four actions are also on the table right-click popup menu.

Common Schedule Panel – The schedule panel is embedded across all dialogs and wizards
for operations that can be scheduled. For example, if you choose to create a virtual copy from
the Common Actions panel under the Provisioning Manger, the Create Virtual Copy dialog
box gives you the option of either creating the virtual copy immediately or selecting a time to
schedule the creation. For more information, see

“The Common Schedule Panel” (page 448)

.

For more information about interface components, see

“Components of the Interface” (page 491)

.

Viewing the Schedules Tab 447

Advertising