Setup, Overview, Installing an hp bladesystem c-class enclosure – HP ProLiant BL620c G7 Server-Blade User Manual

Page 21: Preparing the enclosure

Advertising
background image

Setup 21

Setup

Overview

Installation of a server blade requires the following steps:

1.

Install and configure an HP BladeSystem c-Class enclosure.

2.

Install any server blade options.

3.

Install interconnect modules in the enclosure.

4.

Connect the interconnect modules to the network.

5.

Install a server blade.

6.

Complete the server blade configuration.

Installing an HP BladeSystem c-Class enclosure

Before performing any server blade-specific procedures, install an HP BladeSystem c-Class enclosure.
The most current documentation for server blades and other HP BladeSystem components is available at the

HP website (

http://www.hp.com/go/bladesystem/documentation

).

Documentation is also available in the following locations:

Documentation CD that ships with the enclosure

HP Business Support Center website (

http://www.hp.com/support

)

Preparing the enclosure

HP BladeSystem enclosures ship with device bay dividers to support half-height devices. To install a full-height

device, remove the blanks and the corresponding device bay divider.

CAUTION:

To prevent improper cooling and thermal damage, do not operate the server blade

or the enclosure unless all hard drive and device bays are populated with either a component or
a blank.

IMPORTANT:

For optimal cooling and system performance, configure the c7000 enclosure with

ten fans and configure the c3000 enclosure with six fans.

Advertising