Hp nc524sfp dual port 10gbe module option – HP ProLiant ML370 G6 Server User Manual

Page 80

Advertising
background image

Hardware options installation 80

18.

Power up the server (on page

22

, "

Powering up and configuring the server

" on page

40

).

HP NC524SFP Dual Port 10GbE Module option

When installed on the HP NC375i Integrated Quad Port Multifunction Gigabit Server Adapter, the HP

NC524SFP Dual Port 10GbE Module provides two 10G NIC connectors for server I/O.
If more than one HP NC375i adapter is installed in the server, always install the HP NC524SFP module on

the adapter in expansion slot 10.
The HP NC375i adapter supports four NIC connectors at a time. When the HP NC524SFP module is

installed, two 1G NIC connectors on the adapter are unavailable.

IMPORTANT:

When both an HP NC524SFP module and an optional HP NC522SFP Dual Port

10GbE Server Adapter are installed in the server, only expansion slot 1 has Wake On LAN

capability.

To install the component:

1.

Power down the server (on page

22

).

2.

Disconnect the network cables.

3.

Do one of the following:

o

Open or remove the tower bezel, as needed ("

Open or remove the tower bezel

" on page

22

).

o

Extend the server from the rack (on page

24

).

4.

Remove the access panel (on page

25

).

5.

Remove fan 5 (on page

26

).

6.

If installed, remove the BBWC battery pack or the FBWC capacitor pack (on page

27

).

7.

Remove the air baffle (on page

28

).

8.

Using a T-15 Torx screwdriver, remove the 10G NIC adapter blank.
Save the retaining screw.

9.

Open the expansion board slot retainer.

Advertising
This manual is related to the following products: