Execute an ipl, Figure 58: ipl confirmation dialog box, 58 ipl confirmation dialog box – HP StorageWorks 2.12 Edge Switch User Manual

Page 164

Advertising
background image

Using Maintenance Features

164

Edge Switch Element Manager User Guide

Execute an IPL

Caution:

The Ethernet connection between the HAFM appliance and switch is

interrupted momentarily during an initial program load (IPL). However, this

does not interrupt Fibre Channel traffic.

Caution:

An IPL is not intended for ordinary or casual use and should only be

performed if the control processor (CTP) is suspected to be faulty. Do not use

this option unless directed by your support representative or if you need to set

the CTP.

If it is necessary to execute an IPL on the switch, use the following steps:

1. Click Maintenance > IPL. A dialog box displays prompting you to continue

the IPL.

Figure 58: IPL Confirmation dialog box

2. If you want to continue the IPL, click Yes.

Clicking IPL causes the Ethernet connection between the switch and HAFM
appliance to drop momentarily. It also causes the following to occur in the
Element Manager window:

As the network connection drops, the switch Status table on the Hardware
View turns yellow.

The Status field in the table displays

No Link

and the State field displays

the reason for no link.

A gray square displays in the status bar. See

Table 2

on page 48 for an

explanation of this status bar display.

The FRUs illustrated in the Hardware View do not display. They display again
after the connection is re-established.

Advertising
This manual is related to the following products: