Powering up and configuring the server – HP ProLiant ML350 G4 Server User Manual

Page 43

Advertising
background image

Server Setup

43

11. Route cables through the cable management arm.

12. Connect the power cord to the AC power source.

WARNING: To reduce the risk of electric shock or damage

to the equipment:

Do not disable the power cord grounding plug. The grounding
plug is an important safety feature.

Plug the power cord into a grounded (earthed) electrical outlet
that is easily accessible at all times.

Unplug the power cord from the power supply to disconnect
power to the equipment.

Do not route the power cord where it can be walked on or pinched
by items placed against it. Pay particular attention to the plug,
electrical outlet, and the point where the cord extends from the
server.

Powering Up and Configuring the Server

To power up the server, press the Power On/Standby button.

While the server boots, RBSU and the ORCA utility are automatically
configured to prepare the server for operating system installation.

Advertising
This manual is related to the following products: