2. AC Input Power Cord ( Not available for hand wiring condition models)
3. IEC output cables ( for the UPS with IEC sockets only)
4. RJ11 Phone Jack Cable
5. UPS communication kit (optional)

2. Line Connection

First, connect the UPS with the AC Mains.
Then, connect the line of your computer to the output sockets of the UPS.

3. Operation Test

a. Connect the UPS to the wall receptacle.

Please follow the general testing procedures to check if your UPS meets working
requirements:

(1)

Push on the Main Switch to check the Green Line (

) LED is on.

(2)

Connect your computer equipment with sockets of the UPS and pull off the Power

Cable of the UPS from the wall receptacle to check if the Inverter LED is flashing
every 3 seconds. Meanwhile, please check if Alarm buzzer is beeping.

(3)

Try the field working condition by running some application programs on your

computer and repeating step.

(4)

Check if the UPS is initiated properly to support a continuous operation.


Important Notice: Please plug the UPS into the wall outlet to charge the UPS for over

8 hours before using the UPS.

INTRODUCING THE FRONT PANEL

Front Panel Explanation

1. Line LED (

):

Green LED remains at a standstills when Utility Normal.
Green LED flashes every 3 seconds when Utility Failure.
Green LED flashes every second when Battery Low.

2. Check Battery LED (

):

Red LED lights up when Battery low or fault.

3. Main Switch:

a. To Control on/off the UPS when Utility is normal.
b. To enable “DC-Start” Function when Utility fails. (To enable DC

Start properly, you are recommended to connect <80% output
load with the UPS only)

P.S. Make sure the computer connected to the UPS is switched on before enable the "DC-
Start" function. You are not recommended to add some other computer or peripherals after
DC-Start function is activated.