Installing hardware options, Setting up a tower server – HP ProLiant ML370 G5 Server User Manual

Page 33

Advertising
background image

Setup 33

Operating system or application software

PDU

Installing hardware options

Install any hardware options before initializing the server. For options installation information, refer to the

option documentation. For server-specific information, refer to "Hardware options installation (on page

36

)."

Setting up a tower server

Follow the steps in this section to set up a tower model server. If you are going to install the server into a

rack, refer to the rack installation section ("

Installing the server into the rack

" on page

34

).

1.

Connect peripheral devices to the server.

WARNING:

To reduce the risk of electric shock, fire, or damage to the equipment, do not plug

telephone or telecommunications connectors into RJ-45 connectors.

2.

Connect the power cord to the rear of the server.

3.

Open the power cord retaining clip, and thread the power cord through the retaining clip.

4.

Push the tab into place to secure the power cord.

5.

Connect the power cord to the AC power source.