ATEN ACS1208 User Manual

Page 23

Advertising
background image

2. Installation

11

5. Power up the installation according to the following procedure:

a) Plug in the power adapter for the First Station.

Wait for the unit to ascertain its Station ID and display it on the Station
ID LED. (The Station ID for the First Stage unit is 01, the ID for the
Second Stage unit is 02, the ID for the Third Stage unit is 03, etc.).

b) Plug in the power adapters for each Station on the installation in turn

(Second Station, then Third Station, etc.).

In each case, wait for the Station ID to be ascertained and displayed on
the current Station before plugging in the next one.

c) After all the Stations are up, power on the computers.

acs1208-1216.book Page 11 Friday, April 27, 2007 3:23 PM

Advertising
This manual is related to the following products: