Redundant hot-plug power supply option – HP ProLiant ML570 G4 Server User Manual

Page 62

Advertising
background image

Hardware options installation 62

23.

Install the processor air baffle ("

Processor option

" on page

38

).

24.

Install the access panel. ("

Install the access panel

" on page

27

)

25.

Do one of the following:
— Install and lock the bezel.
— Slide the server back into the rack.

26.

Power up the server (on page

23

).

Redundant hot-plug power supply option

The server supports a second hot-plug power supply to provide redundant power to the system in the
event of a failure in the primary power supply. You can install or replace a second hot-plug power supply
without powering down the server.

CAUTION: If only one power supply is installed, do not remove the power supply unless the server has

been powered down. Removing the only operational power supply will cause an immediate power loss.

NOTE: To remove the primary hot-plug power supply, remove the shipping screw under the power supply

handle. Use the T-15 Torx screwdriver ("

Rear panel components

" on page

9

).

1.

Remove the power supply blank.

Advertising