Installation instructions preparing the opening, Cont) 5, Cutout dimensions of the countertop – GE PP975SMSS User Manual

Page 4

Advertising
background image

4

Installation Instructions

PREPARING THE OPENING

(CONT)

5

Make sure the wall coverings, countertop and

cabinets around the cooktop can withstand

heat (up to 200°F) generated by cooktop.

4

CUTOUT DIMENSIONS OF THE

COUNTERTOP

To insure accuracy, it is best to make a template

when cutting the opening in the counter.

2-1/2" Min.

from front edge

of cutout and

front edge of

countertop

19-1/8" width of cut

33-7/8"

length of

cut

1-3/4" Min. Between

cutout and the wall

behind the cooktop

Wall covering,

cabinets and

countertop must

withstand heat up

to 200°F.

6

For Americans with Disabilities Act (ADA)

Forward Approach Installation Only:

NOTE: The enclosure must be made of wood

material. Also, an access panel is required for the

junction box, hold-down brackets, and service.

For models with

no drop box,

allow 5” minimum

depth between the

countertop and an

enclosure.

For models with

a drop box, allow

6-1/2” minimum

depth between the

countertop and an

enclosure.

(PP975)

6 1/2”

Drop

box

5”

Advertising
This manual is related to the following products: