Installation – GE ZGP304NRSS User Manual

Page 18

Advertising
background image

18

Installation

$&&(6625,(6³72(.,&.

(provided)

• Install the toekick after the range has been leveled.
• Measure the distance between the floor and the

bottom of range.

• Loosen the two screws on each end. Adjust the

toekick height by sliding the upper and lower pieces

apart to 1/8” less than the measured height.

• Secure the top and bottom sections by tightening

the 2 screws on each end.

• Push toekick against range leg until clip snaps

to legs.

NOTE: Be sure the toekick snaps securely to the leg.

Bottom

of Toekick

Screw

Push

Push

Top of

Toekick

Advertising