BMR Suspension SFC013 User Manual

Subframe connectors

Advertising
background image

1

SUBFRAME CONNECTORS

SFC013 – 2008-Present Pontiac G8

Please read the following important information before proceeding with this installation.

• It is recommended to perform this installation on a 4 post service lift with the suspension loaded. It is

possible to use drive-on ramps as long as the full weight of the vehicle is resting on the wheels/tires and
the suspension is fully loaded. Two post lifts or floor jacks are not recommended for two reasons: they
do not load the suspension and they support the
vehicle in the same area that the subframe
connectors attach, preventing access to the
installation area.

Required Tools:

• 3/8” ratchet
• 15mm socket
• 3/8” Allen wrench or Allen socket

Installation Procedure:

1. Lift vehicle.
2. Using a 15mm socket, remove the four bolts that

secure the OE driveshaft tunnel brace and remove
the brace.

3. Locate the 2 sets of frame inserts provided with your

BMR Subframe Connectors. The smaller of the two
fits the rear frame rails and the larger fits the front
rails. As shown in Image 2 to the right, slide the
smaller insert up through the oblong frame hole and
into the frame rail. It should fall rearward, then can
be positioned over the existing holes as in Image 3.

4. Slide the larger front frame inserts into the front rails

and position them over the existing frame holes as in
Image 4 to the right.

5. Choose a side and hold a subframe connector up into

place as shown in the image on the following page.
Insert the supplied Allen bolts and washers. Install
all six subframe connector bolts (four ½” Allen
bolts, two 10mm bolts) but do not tighten any of
them until all six bolts are partially threaded in.
NOTE: a screwdriver or tapered alignment dowel
may be used to line up the bolt holes.




Advertising