CMP A2FFC User Manual

Page 2

Advertising
background image

INSTALLATION INSTRUCTIONS FOR CMP CONDUIT GLAND TYPE A2F-FC

DUBAI

• HOUSTON • NEWCASTLE • SINGAPORE • SHANGHAI • PUSAN • PERTH

DUBAI

• HOUSTON • NEWCASTLE • SINGAPORE • SHANGHAI • PUSAN • PERTH

www.cmp-products.com

www.cmp-products.com

CONDUIT GLAND COMPONENTS

PLEASE READ ALL INSTRUCTIONS CAREFULLY BEFORE BEGINNING THE INSTALLATION
There is no need to disassemble the gland in order to fit it to the conduit.

1. Slacken the seal nut (3) to relax the seal.

4

3

2

1

1. Entry Item

2. Seal

3. Seal Nut

4. Conduit Anchor

2. Pass enough cable through the seal (2) to suit the installation.

4. Bring the conduit into engagement with the conduit anchor (4) and then screw the anchor into

the conduit until it is fully engaged

5. Tighten the seal nut (3) by hand until resistance is felt (when the seal engages the cable) and

then tighten further one full turn with a spanner.

3. Fit the gland into the equipment and fully tighten the entry item (1).

Advertising