Nitrous Express N-TERCOOLER SYSTEM User Manual

Nitrous Express For the car

Advertising
background image

N-TERCOOLER SYSTEM

INSTALLATION INSTRUCTIONS

The most important thing to do now is READ…

UNDERSTAND…AND …FOLLOW…these instruc-

tions. If there is something you don’t understand,

STOP! Call the factory tech department for help. 9:

00 AM to 4:00 PM CST 940-767-7694.

The installation procedures are divided into 5 sec-

tions. Please pay particular attention to each one:

1. Mounting the bottle

2. Routing the supply line.

3. Mounting the cooler ring

4. Wiring the system

5. Testing the system.

Before starting any installation steps:

1. Disconnect the negative battery terminal.

2. Never use Teflon tape on any system fittings.

Tape debris will cause numerous problems rang-

ing from fouled solenoids to blocked jets. Use a

thread sealer such as Permatex 14AR or equiva-

lent Teflon based sealant.

3. Have your bottle filled by a reliable source, being

sure it is filled to capacity with filtered “Nytrous

+” nitrous oxide or CO2. For filling station loca-

tions log on to: www.nitrousexpress.com.

MOUNTING THE BOTTLE

The bottle should be mounted in the trunk area or

outside of the passenger compartment. If this is not

possible or practical a NHRA approved blow down

tube and vent fitting (PN’s 11708, 11709) must be

installed. The positioning of the bottle should be as

shown in diagram “A”. This will allow the siphon

tube to be covered at all times.

The mounting brackets should be assembled on

the bottle with the short bracket approx. 2” from the

bottom.. Use this mock up as a template to locate the

four mounting bolt holes. The bottle should be secured

by a minimum of 4 “Grade 5” 5/16 bolts. Note: Before

drilling holes be sure to check for clearance beneath

the mounting surface i.e.: fuel tank, fuel lines, brake

lines.

DIAGRAM A

ROUTING THE FEED LINE

NOTE: Place a piece of tape over both ends of

the hose to prevent debris from entering the feed line

during the routing process.

The feed line may be routed to the engine com-

partment either through the passenger compartment or

under the vehicle. Route the line carefully to prevent

the possibility of restricting nitrous flow. If routed

under vehicle, locate and drill a 3⁄4 inch diameter hole

in a suitable area near the bottle valve for the main

line. Starting at the bottle nipple route the line to the

engine compartment. Following the factory fuel lines

is usually the best path. Note: Keep maximum clear-

ance between all moving parts, suspension compo-

nents and hot engine components, securing the supply

line where possible (“Zip-Ties” work best here).

Tighten the line to the bottle nipple securely. Be espe-

cially careful of the feed line being near any “HOT”

electrical leads a spark will cause a permanent leak in

the feed line.

MOUNTING THE COOLING RING

Assemble the solenoid to the cooling ring, the

1/8 NPT discharge port on the bottom of the solenoid

mounts directly to the cooling ring. Thread the xD-

4 filter fitting into the inlet port of the solenoid, the

supply line will connect here. Teflon based sealant

should be used to avoid leaks. Mount the NX cooler

ring on your intercooler using the supplied zip ties, do

not over tighten, intercooler damage may result. Con-

nect the supply line to the inlet port on the solenoid at

this time, tighten securely.

WIRING THE SOLENOIDS

1. Mount the red arming switch within easy reach,

and plain sight of the driver.

Advertising