Ridetech 12109100 User Manual

Page 3

Advertising
background image


5. The frame bolts can now be
tightened.

6. Check sway bar and PosiLink
clearance through full suspension
travel.

7. Ensure that the PosiLinks do not
bind through full suspension travel.

4. Slide a T-bushing over the
straight end of the PosiLink, then
slide it through the sway bar.
Another T-bushing will be installed
on the bottom along with a 10mm
Nylok nut.

PDF created with pdfFactory trial version

www.pdffactory.com

Advertising