Ridetech 11224499 User Manual
Page 2
Installation Instructions
1. Remove the sway bar (if
equipped) and factory lower trailing
arm. Do one side at a time to keep
the axle from rotating.
2. Clean bushing mounting surfaces
on frame. Lubricate w/ lithium grease
supplied.
2. Attach to front on the lower
StrongArm to the frame using the ½”
x 3 ½” bolts and Nylok nuts supplied.
3. This arm has holes in the tube for
sway bar attachment. Mount the bar
so that the holes are closest to the
axle. New 7/16” x 3” bolts are
supplied to reattach the sway bar.
4. Attach to rear of the lower
StrongArm to the frame using the ½”
x 3 ½” bolts and Nylok nuts supplied.
Note: These polyurethane bushing
are lubricated at the factory w/ lithium
grease.
Note: Tighten the bolts enough to
remove any lateral movement and
apply moderate drag on bushings.
Over-tightening can cause excessive
suspension bind.