Tuff Country 24950 - Ford 97-03 F150 4 system User Manual

Page 10

Advertising
background image

80. Locate (2) 3/8” x 10” bolts and (2) 3/8” unitorque nuts from hardware bag 24950NB-1. Also, locate (2) sway bar
end links, (8) sway bar end link bushings and (8) sway bar end link washers from hardware bag 24950NB1. Working
on the driver side, install the new sway bar end link and hardware into the stock location. Torque to 32 ft lbs. Make
sure to use thread locker or lock tite.
Repeat procedure on the passenger side.

Photo # 40


81. Check and double check to make sure that all steps were performed properly and then check again. Check and
make sure that all new and stock hardware has been torqued to proper torque specification. Refer to the torque
specification at the beginning of the installation manual.

82. Take the vehicle directly to an alignment shop for a proper front end alignment.

If you have any questions regarding the installation, please contact the technical department @ Tuff
Country. (801) 280-2777


Congratulations, installation complete. Check and double check to make sure that all steps were performed
properly. Check torque settings to make sure that all stock and new hardware has been torqued to proper
torque specifications

Also refer to the Vehicle owners manual for proper torque specifications on any stock hardware.

Special post installation procedure: Tuff Country EZ-Ride Suspension highly recommends
adding a minimum of 1 pint, but no more that 1 1/2 pints, of proper front differential fluid
into the front differential. To achieve this, you may have to fill the differential with it on its
side or you may have to insert the fluid through the vent tube opening. On occasion, the
customer may find burping of fluid coming out of the front vent tube.


Advertising