With flexnet dc), Photovoltaic array (pv), Battery bank – Outback Power Systems FLEXpower ONE System Overview User Manual

Page 7: Ac distribution panel (main panel), Ac sub-panel (120 vac), Flexware pv8 combiner box, Page 5, On-grid wiring, Loads (120 vac), Ground

Advertising
background image

IMPORTANT: Example only. Actual wiring may vary.

Factory wiring not shown. All configurations must comply

with local and national electric codes. Consult your local

electric authority to ensure compliance.

(with FLEXnet DC)

L1

L2

NEUTRAL

GROUND

60 A Circuit

Breaker

(Maximum)

AC Distribution

Panel

(Main Panel)

(120/240 Vac)

GROUND ROD

Primary System

Ground

(Ground Electrode

Conductor)

HOT

NEUTRAL

GROUND

AC Sub-Panel

(120 Vac)

Bypass

Output

Input

Outlet

(RTS)

O

I

O

I

O

I

O

I

O

I

O

I

O

I

O

I

FLEXware PV8

Combiner Box

Battery

Status

900-0094-01-00 Rev A.vsd\On Grid Wiring\2012-03-02

©2011 OutBack Power Technologies. All Rights Reserved.

N

N

L1

L1

L1

L1

N

N

Page 5

CC

PV Circuit

Breaker

Photovoltaic Array

(PV)

GFDI

Negative

Positive

Ground

DC LEGEND

Neutral

HOT L1

Ground

AC LEGEND

L1

N

MATE

RTS

On-Grid Wiring

AC IN

INV

MAIN----------------

3:02:14P

SUM STATUS SETUP ADV

In 23.2 V 0.0 A
Out 27.6 V 0.0 A

0.000 kW 0.0 kWH

AUX: OFF Sleeping

Battery Bank

Vented

Battery

Enclosure

24 or 48 Vdc

1

Connects to the terminal on the
circuit breaker that is opposite
the inverter DC cable.

L1

1

Loads

(120 Vac)