Checkers Guard Dog 1 Channel Low Profile with Standard Ramps User Manual

Heavy duty low profile, 1, 2, 3 or 5 channel systems with standard ramps, Assembly instructions

Advertising
background image

ASSEMBLY:

• Inspect areas for safety hazards
• Assemble sections by aligning female connectors over male connectors
• Press with foot to secure female connectors to male connectors
• Open cover and install cables down into channels
• Close cover flush with base
• Test installation for intended use
• Periodically inspect installation

ASSEMBLY INSTRUCTIONS

#ZIS-GDLP-ST

Ver: 2/11

NO. OF

CHANNELS

5 Channel

24,000 lbs. (10,886 kg)

MAXIMUM LOAD PER TIRE

70

˚

F (21

˚

C)

48,000 lbs. (21,772 kg)

3 Channel

17,000 lbs. (7,711 kg)

34,000 lbs. (15,422 kg)

2 Channel

13,000 lbs. (5,896 kg)

26,000 lbs. (11,792 kg)

1 Channel

13,000 lbs. (5,896 kg)

26,000 lbs. (11,792 kg)

MAXIMUM LOAD PER AXLE

70

˚

F (21

˚

C)

CABLE/HOSE MANAGEMENT COMPONENTS

Simply interlock with

Dog Bone connectors to

extend protection length.

Before installing, ensure circular recessed

areas are free from dirt and debris. Apply

2-3 drops of Checkers Super Glue to the

top of the center post and then place a bead

of glue around the outer edge of the half

moon area. Align rubber pad slot with rib

on Cable Protector, then quickly place

Rubber Pad over the post and slot on cable

protector. Firmly push down with thumb

around the outer edge of Rubber Pad until

fully seated. Repeat until complete.*

RUBBER PAD INSTALLATION

* For your safety, please wear safety glasses and

rubber gloves. Checkers Super Glue is best when

stored refrigerated.

1) Before installing, clean bottom edges of cable protector with a

dry rag. 2) Apply a generous bead of Checkers Super Glue to the

bottom edge of the cable protector (parallel with outer edge). 3)

Quickly place one end of the VELCRO® brand fastener over the

bead of glue, lay the VELCRO® brand fastener strip

down, and apply pressure.

4) Repeat this step for

other side of cable

protector. Trim excess

strip with a razor

blade.*

CARPET KIT INSTALLATION

1

2

3

NOTE:

Optional Anti-Slip Rubber Pads
and Carpet Kits with VELCRO

®

Brand Fasteners can be purchased
and easily installed on Guard Dog
Low Profile Cable Protectors with
Standard Ramps
(see instructions below).

5 CHANNEL STANDARD

3 CHANNEL STANDARD

2 CHANNEL STANDARD

1 CHANNEL STANDARD

CHANNEL CAPACITY - MAX. DIAMETER INCHES (mm)

5 Channel

Center channel: 1.6 in. (40.6 mm) width x .75 in. (19.0 mm) height

Other 4 channels: 1.3 in. (33.0 mm) width x .75 in. (19.0 mm) height

3 Channel

Center channel: 2 in. (50.8 mm) width x .75 in. (19.0 mm) height

Other 2 channels: 1.25 in. (31.8 mm) width x .75 in. (19.0 mm) height

2 Channel

1.5 in. (38.0 mm) width x .75 in. (19.0 mm) height

1 Channel

2.25 in. (57.2 mm) width x .75 in. (19.0 mm) height

HEAVY DUTY LOW PROFILE

1, 2, 3 or 5 CHANNEL SYSTEMS

WITH STANDARD RAMPS

LOW PROFILE PROTECTORS

®

CPRPKIT.75-20

Optional Anti-Slip Rubber Pad Kit for all Guard Dog Low Profile Protectors WITH Standard Ramps (includes 20 anti-slip rubber pads)

CPGLUE

1/2 oz Bottle of Checkers’ Clear Super Glue (best if kept refrigerated). Use for permanent application of Anti-Slip Rubber Pads

CPCARPETKIT-3

Optional Carpet Kit with VELCRO® Brand Fasteners for all Guard Dog Low Profile Protectors WITH Standard Ramps

(includes two 37" x .25" black VELCRO® brand fastener strips and a 1/2 oz Bottle of Checkers’ Clear Super Glue (CPGLUE)

OPTIONAL TRACTION KITS

LOAD CAPACITY:

The Cable/Hose

Protection System has different load

supporting capabilities depending on type of

vehicle and temperature. Suitability must be

verified by testing under actual conditions.

CHANNEL CAPACITY:

OPERATING TEMPERATURE:

-40˚F to 120˚F (-40˚C to 48˚C)

CHEMICAL RESISTANCE:

Tested

for compatibility with common motor oils,

gasoline and diesel fuel. Limited resistance

to brake fluids and other chemicals.

MATERIAL:

UV-stabilized

polyurethane elastomer

Advertising