Checkers Linebacker 5 Channel Cable Ramps User Manual

Heavy duty general purpose, 5 channel system, Assembly instructions

Advertising
background image

HEAVY DUTY

GENERAL PURPOSE

5 CHANNEL SYSTEM

ASSEMBLY:

• Inspect areas for safety hazards
• Assemble sections by aligning female connectors over male connectors
• Press with foot to secure female connectors to male connectors
• Open cover and install cables down into channels
• Close cover flush with base
• Test installation for intended use
• Periodically inspect installation

CHANNEL CAPACITY:

LOAD CAPACITY:

The Cable/Hose Protection System has different load supporting capabilities depending on type of vehicle and

temperature. Suitability must be verified by testing under actual conditions.

OPERATING TEMPERATURE:

-40

˚

F to 120

˚

F (-40

˚

C to 48

˚

C)

CHEMICAL RESISTANCE:

Tested for compatibility with common motor oils, gasoline and diesel fuel.

Limited resistance to brake fluids and other chemicals.

MATERIAL:

UV-stabilized polyurethane elastomer

NO. OF

CHANNELS

5 Channel

10,500 lbs. (4,763 kg)

LOAD CAPACITY PER TIRE

MAX LOAD 70

˚

F (21

˚

C)

21,000

lbs. (9,526 kg)

LOAD CAPACITY PER AXLE

MAX LOAD 70

˚

F (21

˚

C)

CABLE/HOSE MANAGEMENT COMPONENTS

ASSEMBLY INSTRUCTIONS

#ZIS-GP5

Ver: 2/11

CHANNEL CAPACITY - MAX. DIAMETER INCHES (mm)

1 Channel

1.3 in. (33 mm)

width x

1.3 in. (33 mm)

height

Simply interlock with

T-connectors to extend

protection length.

36" Lineal Protector

End Cap

End Cap

Y Protector

GP-

5

Advertising