A.R.I. DG 102 EN User Manual

Maintenance instructions

Advertising
background image

MAINTENANCE INSTRUCTIONS

COMBINATION AIR VALVE

BARAK, MODEL DG-10 2”

GENERAL INSTRUCTIONS

Routine service is an integral part of the standard

procedure for maintenance of a water supply system.

Recommended routine maintenance– once or twice a year, according to the quality

and type of the fluids in the system.

PROCEDURE

Close the service valve under the valve base before servicing.

Turn the valve body (1) counterclockwise, release and remove.

From the valve body (1), remove the clamping stem (4) and carefully pull out the

float (5) with the attached rolling seal assembly (3).

Check the soundness of the rolling seal assembly (3) by washing it with water and

examining it. Replace the seal assembly in case it is torn.

Wash the body (1) and the float (5) with clean water and examine it for damage.

Replace the float if it is damaged.

Clean the drainage elbow (2) to remove insects and debris.

Return the float (5) with the attached rolling seal assembly (3) to its original

position in the valve body (1) and lock them into place with the clamping stem (4).

Close the body of the valve by turning it clockwise, making sure that the O-ring (6)

is located in its place in the base of the valve (7).

Remember to open the service valve after the servicing.

PARTS SPECIFICATION

NO.

DESCRIPTION

MATERIAL

1.

Body

Reinforced Nylon

2.

Drainage Elbow

Polypropylene

3.

Rolling Seal Assembly

4.

Clamping Stem

Reinforced Nylon

5.

Float

Foamed Polypropylene

6.

O-ring

Buna-n

7.

Base

Reinforced Nylon / Brass

5

4

3

2

1

6

7

Advertising