MAINTENANCE INSTRUCTIONS

COMBINATION AIR VALVE

MODEL D-070-P

GENERAL

1. The periodic maintenance of the air valve is an integral part in the proper

regimen of water pipeline maintenance.

2. The air valve should be maintained at least once a year in accordance with the

quality of the water and the types of fluid composition in the system.

INSTALLATION

Before installing the Model D-070-P air valve, make sure to flush and drain the
pipeline of all dirt and solids that may be in the line.
Installation of an isolating valve: An isolating valve will be installed under each
air valve to enable the performance of periodic maintenance.
Installation of a riser: It is recommended to install the Model D-070-P air valve
on top of a riser (see Fig.1). Diameter of the riser should be at least one-half the
diameter of the pipeline.
Manifold: When the valve is installed on a manifold, the air valves should be
installed only on a welded manifold. They should be installed in a manner that the
drainage port openings should face in opposite directions (see Fig.2).

DRAIN PORT

1. Drainage angle: It is recommended installing a drainage angle at the drain

port (#1) exit; the diameter of the drainage angle should be at least the
diameter of the drain port.

2. Maintain an open drain port: Do not seal or block the opening of the valve

drain port (#1).

3. Warning on emission of water: The normal operation of the valve includes

water emissions under pressure. Ensure that the drain port (#1) is not
directed toward electrical elements (pumps) or people.

4. Caution: Do not put hands or objects into the drainage port (#1).
5. Drainage Pipe: Drainage pipes, at least 2" in diameter with a maximum

length of 9m, can be connected to the drainage angle to direct the emission
water. The end of the drainage pipe should remain completely open and
unobstructed. Do not connect a drainage pipe to the upper drainage port
(#2).

WARNING

Perform the following operations prior to maintenance or removal of the air
valve from the pipeline:
1. Shut the isolating valve (Fig.1) on the riser below the air valve.
2. Slowly open the Locking Ring (6) until water and air start to be released. Wait

until all the water and air cease to be released before continuing

3. Continue to open the Locking Ring (6) slowly; making sure that the pressure

has been released from inside the air valve prior to maintenance/removal
from the pipeline.

Fig. 2

Drain Port #2

Drain Port #1

Fig. 1

Isolating valve