A.R.I. K-060 EN User Manual

Installation and maintenance of, A.r.i.’s k-060 combination air valves, B.6 open the isolating valve beneath the air valve

Advertising
background image


Installation and Maintenance of

A.R.I.’s K-060

Combination Air Valves

B.

Basic, Periodic, Maintenance


B.1

Shut the isolating valve below the air valve.

B.2 Unscrew

the

bolts

(2) that connect the

valve cover (3) to its body (9).

B.3 Wash the body , the screen and the cover in

clean water in order to remove coarse
grime or accumulated scale.

B.4 Check body & cover coating for rust points.

Recoat if necessary

A. Installation

B.5 Reinstall

in

reverse order and fasten and

tighten all bolts.

A.1

The air valve will be
mounted on a riser,
connected to the top of the
pipe.

B.6 Open the isolating valve beneath the air
valve.

A.2

An isolating valve will be
installed below the air
valve.

Parts Specification

1a.

Protective Cover

Cast Iron

1b.

Filter

Stainless Steel SAE 304

1c.

Bolt & Nut

Galvenized Steel

1d.

Crown Nut

Galvenized Steel

2.

Bolt

Galvenized

Steel

3.

Cover

Cast Iron ASTM A48

4.

Nozzle Seat

St.St. SAE 403 or 316

5.

Nozzle Seal

E.P.D.M.

6.

O-ring

Buna-

N

7.

Nut

Galvenized

Steel

8.

Float

Stainless Steel SAE 316L

9.

Body

Cast Iron ASTM A48



A.R.I FLOW CONTROL ACCESSORIES

Advertising