WeatherHawk Inversion - Wireless User Manual

Page 20

Advertising
background image

WeatherHawk

®

17

815 W. 1800 N. Logan, Utah 84321-1784, Email: [email protected]

Copyright © 2004, 2010

Toll free in USA: 866-670-5982, International: 435-750-1802, FAX: 435-750-1749

Printed November 2010

Figure 31: Tape Measure in slot
for North East Anchor

UTDUK
(towers)

60

o

2.

At 20 feet, install the duckbill anchor with the supplied drive rod. The anchor needs to be driven into the ground
at a 45° angle (see Figure 29). Drive the anchor into the soil until the loop or metal ring is approximately 4
inches above the ground.

















3.

With a rod through the loop or metal ring, pull up on the cable or threaded rod until the anchor rotates and locks
(see Figure 30).










4.

Fill-in the hole around the cable or threaded rod with loose dirt and tap firm.


5.

Repeat process for the northeast (see Figure 31) and northwest anchors.
















Figure 30: Locking Anchor

NE

Figure 29: Anchor Driven into Ground at 45° Angle.

45

º

Drive Bar

Duckbill Anchor

Advertising
This manual is related to the following products: