State GP6 50 HTPDT User Manual

Page 26

Advertising
background image

26

vertIcal vent terMInal InstallatIon

when terMInatInG throuGh a roof, the followInG

specIfIcatIons pertaInInG to terMInal locatIon

Must be followed.

1. Proper support must be provided for all pipe protruding through

the roof.

2. The vertical roof terminations should be sealed with a plumbing

roof boot or equivalent flashing.

3. The intake vent terminal and the exhaust vent termination must

penetrate the same side of roof.

4. The center line of the intake vent terminal and the center line of

the exhaust vent termination must be no closer than 24” (61cm).

The specifications are displayed in Figures 17 and 18.

NOTE: Exhaust vent terminal is installed using the same

procedure.

flat roof InstallatIon

On flat roof installations the intake air and the vent terminations must

be a minimum of 24 inches (60 cm) above any parapet, vertical wall

or structure within 10 feet (3 m) horizontally. See figure 19.

fIGure 17.

fIGure 18.

INTAKE AIR AND/OR VENT

TERMINATION(S) MUST BE A

MINIMUM OF 24 INCHES (60 cm)

ABOVE ANY PARAPET, VERTICAL

WALL OR STRUCTURE WITHIN

10 FEET (3 m) HORIZONTALLY.

VERTICAL TERMINATION(S) FLAT ROOF CLEARANCE

INTAKE VENT TERMINAL AND/OR VENT (EXHAUST)

24 INCHES (60 cm)

MINIMUM HEIGHT ABOVE

IF LESS THAN

10 FEET (3 m)

NOTE:

INTAKE VENT

TERMINATION

SHOWN HERE

fIGure 19.

Advertising
This manual is related to the following products: