4) COMMISSIONING THE HEATER

BEFORE SWITCHING THE ELECTRICAL BREAKER “ON”, MAKE SURE
THE INLET AND OUTLET BALL VALVES ARE FULLY OPEN AND WATER
IS FLOWING THROUGH ALL POINTS OF USE FOR A MINUTE OR TWO
UNTIL THE FLOW IS CONTINUOUS AND FREE FROM AIR POCKETS.

DO NOT SWITCH THE BREAKER “ON” IF THERE IS

ANY

POSSIBILITY

THE WATER IN THE HEATER IS FROZEN.

After verifying the heater has been
purged of air (see above) turn the circuit
breaker/disconnect “ON” and observe
the start-up sequence on the display.
The LCD screen will display the SETPOINT
TEMPERATURE in degrees F.

Below the display are 4 push buttons that
are used to control the function of the
heater. Press the UP or DOWN buttons to
establish your desired temperature. Refer
to the CONTROL FEATURES section of this
manual for additional information.

The heater is fully installed and ready for use.

ELECTRICAL SPECIFICATIONS

VOLTS

AMPS

RECOMMENDED

MODEL

3-PHASE DELTA

Kw

PER PHASE

WIRE SIZE (CU) 75° C

AP032208

208

32

89

3 AWG

AP041208

208

41

114

2 AWG

AP054208

208

54

150

1/0

AP064208

208

64

178

3/0

AP036480

480

36

44

8 AWG

AP048480

480

48

58

6 AWG

AP054480

480

54

65

6 AWG

AP072480

480

72

86

3 AWG

AP108480

480

108

130

1 AWG

AP126480

480

126

152

2/0