Posey Bed Top Rail System User Manual

Posey, Bed top rail system, Storage and handling

Advertising
background image

M6185 REV C 121610

© 2010 Posey Company. All rights reserved.

Posey Company • 5635 Peck Road, Arcadia, CA 91006-0020 USA • www.posey.com

Phone: 1.800.447.6739 or 1.626.443.3143 • Fax: 1.800.767.3933 or 1.626.443.5014

Posey

®

Bed Top Rail System

For use with Posey Bed models 8040, 8050, 8060

REF

8011 Top Rail System

To Assemble the Top Rail System:

1. Remove the

screw from

part one.

NoTe: Leave

pre-installed

corner pads in

place.

2. Holding both

pieces, align

the roller on

part two with

the slots on

part one.

3. Slide the roller

all the way into

the slots,

making sure to

hold the two

pieces together

so they do not

fall.

4. Replace the

screw into part

one.

6. When the top piece is in

place, the silver metal

detent pin should be in the

upper most hole in both

A-Frames.

5. NoTe: This step may

require two people.

To place Top Rail System

into frame, place each

piece of the top rail into

the metal retainers on

each side as shown.

The Posey Bed Top

Rail System was

created to allow

articulation of the

Posey Bed with

greater ease and

help eliminate the

potential

“Binding” that can

occur. The System

comes standard

with the Posey

Bed 8060 model and retrofits to the 8040 model.

Storage and Handling

This device is designed for use in normal indoor environments.

This device may be stored in ambient warehouse temperatures

at normal humidity levels. Avoid excess moisture or high

humidity that may damage product materials.

Disposal

Properly dispose of the product per facility’s

policy for BIOHAZARDOUS materials.

Part 2

Part 1

Top Rail

Advertising