This document contains the operating instructions and recommended procedures for installing a Hawkeye Industries Series 5000 Emer-

gency Pressure Relief Vent.

Requirements

Ensure that the tank has been fitted with a man way opening and

the appropriate flange connection.

Tools

Parts Required

Unladen Weights

A.) Installing the Series 5000 EPRV

Lift the EPRV onto the tank using lifting lugs and proper lifting procedures.

Do not lift device by hand or with any weight plates installed.

Clean all debris and residue from flange gasket and mating surfaces. Set

flange gasket on the tank flange and EPRV on the flange gasket, aligning

the bolt patterns.

Installation & Maintenance Guide

Series 5000 EPRV

QTY

Part

Installation

1

Series 5000 EPRV, c/w

1

Flange Gasket

► varies Mounting Hardware

► varies Dead Weight set pressure plates

Maintenance

1

Replacement Gasket

Dow Corning #4 Electrical Insul. Compound (or eq.)

QTY

Tool

All Models

1

Side Cutters

2

3/4” Open End Box Wrench

1

3/4: Deep Socket, 1/2” Max Drive

1

Torque Wrench from 59 to 121 ft-lb

For 20” and 24” API 650 Flange Mount EPRVs

2

15/16” Open End Box Wrench

1

15/16” Socket

For 20” ANSI 150# Flange Mount EPRVs

1

1-11/16” Open End Box Wrench

1

1-11/16” Socket

For 24” ANSI 150 Flange Mount EPRVs

1

1-7/8” Open End Box Wrench

1

1-7/8” Socket

Series 5000 EPRV Installation Instructions, May 2014

1

Contents

A.) Installing the Series 5000 EPRV
B.) Series 5000 EPRV Operating Instruction
C.) Maintenance

SIZE

W/ STEEL BASE

W/ ALUMINUM BASE

20 API

143 lb [64.7 kg]

111 lb [50.2 kg]

20 ANSI

144 lb [65.2 kg]

112 lb [50.7 kg]

24 API

187 lb [84.6 kg]

149 lb [67.4 kg]

24 ANSI

192 lb [86.9 kg]

153 lb [69.2 kg]

1